Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8764123

- Product Categories
- Friendly Links
Information Name: | Supply the external walls of transparent waterproof coating |
Published: | 2012-02-27 |
Validity: | 360 |
Specifications: | |
Quantity: | 5000.00 |
Price Description: | |
Detailed Product Description: | External walls of transparent waterproof coating DM-120 Advantage The coating has excellent film-forming properties, the film is bright and dense; The film has a one-way permeability within the base surface moisture outward evaporation without bubbling, can prevent the entry of external water molecules and gas molecules, but impermeable 3 coating is colorless, transparent coating will not destroy the original base surface effect, the same yellow, non-stick dust, no pollution, the same black; Easy construction, safe operation, brushing or spraying, tools for easy cleaning. Recommended for A variety of concrete structures surface protection, waterproof and carbonation; (2) the external walls of buildings surface water moisture mildew; 3 a variety of external walls of the building surface seepage waterproofing; 4 color plates and roof waterproofing layer overlays; wall waterproofing, wall plugging the external walls of impermeable, waterproof wall tile DM-120-I type with strong permeability, can be used for the absorbent base surface; The DM-120-II-type non-absorbent base surface. Typical performance indicators Appearance: milky white viscous liquid Density, g/cm3: 1.02 ~ 1.06 Solid content,%: 48 ± 2 Appearance of the coating: clear, transparent Impermeability 0.3Mpa, 30min: impervious Use A first construction of the base surface to clean, no grease, dust and other impurities, defects at the first patch; The gap between the tiles should be dense, and may not have a break if interrupted first the impermeability One (retarding) fixed; First transparent waterproof paint brushing twice tile construction gap, wait until the construction of the dry film and then a large area; 4 prior to use transparent waterproof coating Stir well and can be painted in the construction, the proposed construction from top to bottom, left to right Pass dry film, painted a second time, according to the construction requirements to determine the number of brushing times, general brushing twice is appropriate; If the water absorption of the base surface, should be coated with primer, primer can be used this material plus 30% water Stir, brushing again, dried and then coated with the DM-120. Dosage: 0.2 ~ 0.3kg / ㎡ Packing: plastic drum: 16 kg / barrel |
Admin>>>
You are the 14885 visitor
Copyright © GuangDong ICP No. 10089450, Germany and the United States Building Materials Engineering Co., Ltd. (Taiyuan) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 14885 visitor
Copyright © GuangDong ICP No. 10089450, Germany and the United States Building Materials Engineering Co., Ltd. (Taiyuan) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility